Abdul-Aziz, A-R, Ngau, D P, Lim, Y M and Nuruddin, A R (2011) Internationalization of Malaysian quantity surveying firms: exploring the best fit models. Construction Management and Economics, 29(01), 49–58.

Brown, A D and Phua, F T T (2011) Subjectively construed identities and discourse: towards a research agenda for construction management. Construction Management and Economics, 29(01), 83–95.

Chang, Y, Wilkinson, S, Potangaroa, R and Seville, E (2011) Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China. Construction Management and Economics, 29(01), 37–48.

  • Type: Journal Article
  • Keywords: disasters; post-disaster reconstruction; resource availability; construction projects; China
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2010.521761
  • Abstract:
    The availability of resources allows for the rapid and cost-effective delivery of a construction project. For rebuilding programmes after a disaster, the need for better understanding of factors affecting resource availability and their potential impacts on resourcing outcomes can be of crucial importance to effective reconstruction performance. Drawing on an empirical survey in China following the 2008 Wenchuan earthquake, the critical factors affecting resource availability for post-quake reconstruction of housing are identified. Resource availability in a post-disaster situation is not only associated with (1) project-related factors such as quantity of resources required, project schedule, project resourcing plan, and resource procurement lead time; and (2) factors related to the reconstruction practitioners, including competency of resourcing manager and qualification of contractor; but is also related to (3) factors external to reconstruction projects including legislation and policy, general economic environment, and resource transportation cost and method. To address these factors, a multi-sector approach is needed for reconstruction decision makers and practitioners. A planned procurement strategy in the implementing contractors, a range of training initiatives for small and medium businesses, along with augmented regulatory, economic and transport infrastructure systems are likely to improve resource availability for post-disaster rebuilding projects.

Dursun, O and Stoy, C (2011) Time-cost relationship of building projects: statistical adequacy of categorization with respect to project location. Construction Management and Economics, 29(01), 97–106.

Gundes, S (2011) Exploring the dynamics of the Turkish construction industry using input-output analysis. Construction Management and Economics, 29(01), 59–68.

Lu, W, Olofsson, T and Stehn, L (2011) A lean-agile model of homebuilders' production systems. Construction Management and Economics, 29(01), 25–35.

Mbiti, T K, Blismas, N, Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviour of construction activity in Kenya. Construction Management and Economics, 29(01), 3–13.

Thomson, D (2011) A pilot study of client complexity, emergent requirements and stakeholder perceptions of project success. Construction Management and Economics, 29(01), 69–82.

Wu, J, Kumaraswamy, M and Soo, G K L (2011) Dubious benefits from future exchange: an explanation of payment arrears from "continuing clients" in Mainland China. Construction Management and Economics, 29(01), 15–23.